Active Building Status

Below is a table with buildings organized by the following categories:

Active: ITS has begun work to bring the building up to current standards.

Planned: The building is on the future execution schedule, but the initial work has not started.

Complete: Buildings are considered substantially complete when occupants can realize the benefits and use the space for its intended purpose. These buildings may require some minor additional work that does not impact its functional use.

Note: Some of the building marked completed do not have a date listed. This is because they were brought up to the current standard as part of a separate construction project (i.e., new construction).

LOCATION/TYPE BUILDING NAME COMPLETION YEAR
ACADEMIC RYAN HALL 2022
ACADEMIC BEACH HALL 2024
LAW HTFD LAW SCHOOL-STARR HALL 2025
LAW HTFD LAW SCHOOL-HOSMER HALL 2024
LAW HTFD LAW SCHOOL-KNIGHT HALL 2024
LAW HTFD LAW SCHOOL-CHERYL A CHASE HALL 2025
ACADEMIC BABBIDGE LIBRARY (HOMER) 2024
RES_HALL MCMAHON HALL and DINING FACILITY 2023
RES_HALL HARTFORD HALL, NC DORM 1 2024
RES_HALL WINDHAM HALL, NC DORM 5 2024
RES_HALL NEW LONDON HALL, NC DORM 3 2024
RES_HALL MIDDLESEX HALL, NC DORM 7 2024
RES_HALL FAIRFIELD HALL, NC DORM 4 2024
RES_HALL TOLLAND HALL, NC DORM 8 2024
RES_HALL LITCHFIELD HALL, NC DORM 6 2024
RES_HALL NEW HAVEN HALL, NC DORM 2 2024
RES_HALL MCCONAUGHY HALL, NC DORM 11 2024
AVERY POINT AVP COMMUNITY AND PROFESSIONAL BLDG 2022
RES_HALL HURLEY HALL, NC DORM 9 2024
RES_HALL BALDWIN HALL, NC DORM 10 2024
LAW HTFD LAW SCHOOL-LAW LIBRARY 2026
AVERY POINT AVP PROJECT OCEANOLOGY BLDG 2022
HORSEBARN HILL HORSEBARN HILL ARENA 2022
AVERY POINT AVP JOHN GARDNER BOATHOUSE 2022
AVERY POINT AVP CENTRAL UTILITY PLANT 2022
AVERY POINT AVP RANKIN RESEARCH LAB 2022
AVERY POINT AVP MARINE OPERATION/DIVE LOCKER 2022